Gatchina Power Grid

Branch of PJSC "Lenenergo", OJSC "Gatchina Electric Networks" provides electricity consumers in the territory of more than 8000 square kilometers with a population of over 900 000 people.

General information:

  • Branch of PJSC "Lenenergo", OJSC "Gatchina Electric Networks"
  • 2 district electrical networks - RES Gatchina, Lomonosov distribution zone; Service manual transmission lines 35-110, 35-110 kV substations service operation.
  • Service area: 8,000 square kilometers, comprising - Gatchina, Lomonosov, Tosno districts, part of Volosovo and Kingisepp districts
  • Service population: 900,000 people
  • Large energy consumers: JSC "Krizo Plant", JSC "Petrel", Institute of Nuclear Physics
  • Major settlements: Mr. .Gatchina, Sosnovy Bor, Volosovo, Tosno
  • Branch Director: Sergey Szymanski

Facts and figures:

  • full-time staff - 603
  • overhead lines 35-110 kV (km) - 1414
  • 0.4-6-10kV air line (km) - 5463
  • cable lines (km) - 227
  • substations of 35-110 kV (pcs.) - 68
  • transformer substations (pcs.) - 1550
  • total transformer capacity of energy sources (MBA) -1900


Contact PJSC "Lenenergo", OJSC "Gatchina Electric Networks"

Address: 188300, Gatchina, Ave 25 October, d.42, letter. A3

tel. (81371) 30-936

fax: (81371) 30-843


Customer Service Center, a branch of OJSC "Gatchina Electric Networks"

Address: 188300, Gatchina, Ave 25 October, d.42, letter. A3

tel. (812) 458-36-93, 8-800-700-14-71;

fax: (812) 458-36-94


Opening hours:

Acceptance of applications:

Tuesday, Thursday from 9:00 to 12:00, from 14:00 to 17:00

Issuance of finished documents:

Monday, Tuesday, Wednesday and Thursday from 09:00 to 12:00, from 14:00 to 17:00

Friday from 9:00 to 12:00, 14:00 to 16:00

Historical reference:

  • Branch "Gatchina Electric Networks" was founded in 1964 on the basis of the 4 areas of electric systems: Vyritsky, Krasnoselsky, Lomonosov and Christmas.
  • In 1969 Gatchina station 5th district of the Leningrad High Voltage high-voltage network, and in 1976 Lomonosov land were transferred to the "Gatchina Electric Networks", organized by the high-voltage area
  • In 70 years a lot of work has begun on the development of the electrification of the village, a reliable distribution network 110-35-10-0,4 kV was created.
  • In the 70 to create a network backbone 330 kV substations and the expansion of the base-330 №42 «Gatchina», which was established 3 autotransformer 330 kV, with total capacity of 600 MVA.
  • In 2004, there were changes in the structure of the enterprise - in the branch "Gatchina Electric Networks" came Tosno district electrical networks.